establish a time-phased plan and schedule for the delivery of artifacts, the tracking of artifact submission, and the status of questions posed in preparation and closeout of an IBR.
Provides visualization of the entire MS Project schedule, with features for drill down, schedule tracing, historical trending, performance metrics, reporting and ad hoc visualization and analysis.
Overall management assessment of project or program execution by key stakeholders and key performance parameters. Includes all facets including cost, schedule, financial, earned value, technical and risks.
Integration and configuration of contract deliverables for example Project Control Plans and their evolution through the lifecycle of the project (SEMP, VVP, FOP, IP, PP, Environmental, etc.).
Workspace application that collects financial data to generate the Contract Funds Status Report (CFSR) and provides analysis and predictive analytics of the data underlying the report and cross references to IPPM/IPMDAR data.
An application that summarizes appropriate data from contractors for generation of NASA 533M and NASA 533Q reports and cross references to IPPM/IPMDAR data.
Comprehensive application that provides real-time review of the status of high-level requirements, highlighting potential problem areas before they can impact schedule.
Application to support project Safety & Mission Assurance functions. Can Provide hazard register that lists those hazards identified by engineering personnel.
Provides technical details of vision and demonstrator systems and tracks risk, technology readiness level, schedule, and other attributes of the systems by subsystem, allowing quick identification of problem areas.
Designed to create and customize design reviews, track deliverables against entrance and success criteria, and track RFAs/RFIs that arise from the reviews.
Approve, assess, and manage risks at various levels, assess their impact across the organization, create custom reports for different user groups, customize risk assessments and reports for organizational groups.
Ability to plan assign and track mitigation plans through out the risk lifecycle.Ability to integrate schedule with mitigation plans
Ability to assess mitigation plan effectiveness vs planned.
Ability to run a JCL on detailed IMS using both resource rates and or fixed costs as well as analysis on IMS eliminates need to generate a summary model