Baseline Change Control and Review

Flags cost and schedule changes across two periods with drill down by Control Account, Work Package and Task level. Allows for changes tracking and impact analysis.

Part Of:

Purpose-built workspace that flags cost and schedule changes across two periods with drill down by Control Account, Work Package and Task level. Allows for changes tracking and impact analysis.

  • Flags control accounts that contain changes (BAC Cost, BAC Hour, and BAC Time-phasing start and end dates).
  • Juxtaposes changed control accounts illustrating BAC data for previous and current period.
  • Calculates total difference of BAC values from previous and current period.
  • GANTT illustrates baseline time-phasing changes (at complete, duration, schedule) from one period to the next.
  • Can filter, sort, trace, and organize types of changes by category to address and reference to the specific element.
  • Visualizes, as desired, changes of Control Account and/or lower element data, which includes work packages, monthly time-phasing, and schedule tasks.
  • Histogram illustrates entire span of BCR changes from inception to finish.