Comprehensive purpose-built schedule analysis application workspace that provides for visualization of the entire MS Project schedule, with features for drill down, schedule tracing, historical trending, performance metrics, reporting and ad hoc visualization and analysis
Key Operational Functions:
- Data is filtered to exclude LOE tasks.
- Provides ability for users to input narratives and narrative analysis, and link to external docs.
- Provides all previous period task data stored by period.
- Side-by-side analysis against any previous periods is provided.
- Full advanced analytical visualization of all aspects of the IMS is provided that includes schedule execution against baseline, total float consumption index, cumulative duration variance, current execution index, baseline execution index, monthly BEI and hit percentages, Open tasks that are in-progress, late or on-time for total float analysis, IMS change capturing, delinquent task trending, breakout of delinquent tasks, forecast finish validation analysis, duration comparisons, baseline execution.
- Full critical path analysis, secondary and tertiary path analysis.
- 14-point assessment.
- Grid/GANTT of entire schedule used in the analysis as well as selected historical periods for trending and comparison.
- Completion heat-map of past performance against baseline and forecast dates.
- Histogram illustrates along the time-phased path the number of finishes/starts for late and early dates, cumulative finishes/starts for late and early dates, with comparison to the schedule baseline in all cases, per the selected driving path method.
- Data quality indicators delivered as alerts and linked to the portions of the data requiring inspection and/or correction.