Ability to run a JCL on detailed IMS using both resource rates and or fixed costs.Analysis on IMS eliminates need to generate a summary model.
Key Features
- Import cost and resource loaded P6 (*.xer), MSP (xml), MPX, and IMPDAR (Proteus) schedules
- Run integrated cost and schedule risk analysis including resource (time dependent) and fixed (time independent) costs.
- Joint Confidence Level plots for the Project and all activities in the schedule including milestones or summary activities.
- Up to 10 user defined confidence levels can be plotted
- Results for each plot line can be saved to csc file
- Four quadrants as a % of meeting or over budget or schedule can be viewed for each iteration or specific cost, duration, or finish time