SNA Software logo: three colored blocks with letters S, N, A, followed by the word Software.
SNA Software logo with red, orange, and peach blocks spelling SNA and the word Software on the right.

Dashboard App Category: IPPM Applications Suite Library

Utilizes data from legacy schemas including the DoD IPMR and IPMDAR to provide a comprehensive EVM, Schedule, and Risk analysis capability.

Supplemental EVM and Schedule Data Entry

Enables the utilization of risk data for analysis, visualization, and tracking of contingencies at contract level, including comparing EACs, milestone tracking, and providing executive summaries.

Data Maintenance

Special-purpose application for maintaining and validating data in database for IPPM data.

Loaded IPPM Data

Verifies data that is loaded in the database via Grid views and other visualizations to allow for validation and review.

User and Workspace Logging

User and Workspace Logging Records and visualizes Dashboard Application usage by user and aggregate analytics. Also tracks user transactions on the system for audit and accountability.

EVM Child Drivers

Focused application that shows variance trending for an element, it's children and grand children to easily identify cost and schedule EVM variance drivers.

Integrated Project Management

Fully integrates cost and schedule performance metrics and analysis for EVM, GEAC, IMS, and risk information. Provides

Advanced Integrated Cost and Schedule Metrics

Delivers advanced cost and schedule blended metrics and analysis for predicting future cost and schedule variances, and to validate and reconcile metrics based on differing bases of calculation for the same systems.

IMS Driving Path

Enables schedule analysis by allowing users to filter driving paths to a selected milestone in the IMS and provides a comprehensive selection of best practice analytical information for use on the IMS.

Schedule Analysis with 14-Point Assessment

Visualization of the entire IMS, with features for drill down, schedule tracing, historical trending, performance metrics, reporting and ad hoc visualization and analysis.

Time Phasing Analysis

This integration Dashboard Application visualizes EVM and IMS data to identify inconsistencies and provide insights for proactive project management.

Quick Look IPPM

Delivers focused key cost and schedule performance metrics for a contract. Especially useful for specialized or new personnel, or for initial analysis and validation of early contract deliverables.

Variance Analysis Reporting

Flags variance breaches and allows for Format 5 variance inputs, links to documentation, and full visualization of all aspects of the process.

IPMR Schedule Compare

Highlights schedule changes, tracks undocumented changes, date, duration, logic, code and criticality changes. Useful in tracking undocumented or ad hoc changes that will create erroneous IMS submissions

Time-phasing Compare

Allows the comparison of two time-phased EV data periods, identifying discordant WBS changes and assisting in tracking retroactive changes for consistent planning and execution in cost performance progress calculation and reporting.

PPM Dashboard

Project, Program and Executive Management.

EVM and Schedule Performance

Reports and visualizes level 1 performance data across projects and programs to easily compare performance, providing data regarding differences among project and program performance, and future planning and execution data.